Shop Weld-On Top JIC Reservoir Tanks
In hydraulic systems, Weld-On Top JIC reservoirs refer to containers designed with a lid that is welded securely to the top of the reservoir. Weld-On Top JIC reservoirs are commonly utilized in applications where a permanent attachment of the lid to the reservoir is necessary, providing a reliable and leak-proof storage solution for hydraulic fluid within the system.
Style:
Reservoir Capacities
Material:
View the Catalog:
View the Collection:
Shop Weld-On Top JIC Reservoirs
Click on the model number in the chart below to view that item. Options show below are most common and readily available.
Don't see what you need? Ask our technical team for a unit fit for your application!
Product SKU | Series | Reservoir Capacity | Material | Reservoir Type | End Cover Diameter | Lead Time | Price |
---|---|---|---|---|---|---|---|
RJIC010-FT | RJIC | 10-Gallon | Carbon Steel | JIC Welded Top | 12" | 4-6 Weeks | $613.99 |
RJIC015-FT | RJIC | 15-Gallon | Carbon Steel | JIC Welded Top | 12" | 4-6 Weeks | $619.99 |
RJIC020-FT | RJIC | 20-Gallon | Carbon Steel | JIC Welded Top | 12" | 4-6 Weeks | $642.99 |
RJIC030-FT | RJIC | 30-Gallon | Carbon Steel | JIC Welded Top | 12" | 4-6 Weeks | $670.99 |
RJIC040-FT | RJIC | 40-Gallon | Carbon Steel | JIC Welded Top | 12" | 4-6 Weeks | $762.99 |
RJIC050-FT | RJIC | 50-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $857.99 |
RJIC060-FT | RJIC | 60-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $921.99 |
RJIC080-FT | RJIC | 80-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $1,100.99 |
RJIC100-FT | RJIC | 100-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $1,193.99 |
RJIC120-FT | RJIC | 120-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $1,424.99 |
RJIC150-FT | RJIC | 150-Gallon | Carbon Steel | JIC Welded Top | 16" | 4-6 Weeks | $1,567.99 |
RJIC200-FT | RJIC | 200-Gallon | Carbon Steel | JIC Welded Top | 18" | 4-6 Weeks | $1,835.99 |